玻化微珠保温砂浆施工步骤及注意事项

时间:2016-07-18     作者:www.hdbwsj.com【原创】   阅读

膨胀玻化微珠保温砂浆是以膨胀玻化微珠为轻质骨料与膨胀玻化微珠保温胶粉料按照一定的比例搅拌均匀混合而的用于外墙内外保温的一种新型无机保温砂浆材料。膨胀玻化微珠保温砂浆具有优异的保温隔热性能和防火耐老化性能、不空鼓开裂、强度高、现场施工加水搅拌即可使用。

Vitrified beads insulation mortar is expansion vitrified beads for light aggregate and vitrified beads insulation powder material according to certain proportion mixing evenly mixed and used for internal and external wall thermal insulation material of a new type of inorganic thermal insulation mortar. Vitrified beads insulation mortar with excellent heat preservation and heat insulation and fire resistance to aging performance, no empty drum cracking, high intensity, site construction and water mixing can be used.


一、膨胀玻化微珠保温砂浆施工步骤:

A, vitrified beads insulation mortar construction steps:


1、基层处理:墙面应清理干净,无油、无浮尘等。旧墙面松动、风化部分剔除干净,表面凸起部分≥10mm应铲平。

1, the basic level processing: metope should be clean, no oil, no dust and so on. Old metope loose parts, weathering clean, bumps on the surface of the 10 mm or higher should be razed.


2、砼梁柱或加气砼等墙体基层必需用砼界面剂一遍。

2, concrete beams or aerated concrete wall at the grass-roots level required with concrete interface agent again.


3、吊垂直,套方找规矩,弹厚度控制线,按设计要求厚度用膨胀玻化微珠保温砂浆作标准厚度冲筋。

3, vertical, set to find the rules, play thickness control line, according to the requirements of design thickness by expansion vitrified microsphere, as a standard thickness of insulation mortar screed.


4、拌:膨胀玻化微珠外墙保温砂浆与水必须按【1:(1~1.1)】的重量比,先将水放入搅拌容器中,再将保温砂浆放入搅拌使用。

4, mix: expansion vitrified microsphere, exterior wall thermal insulation mortar and the water must be 1 (1 ~ 1.1) 】 【 weight ratio, first put water in a mixing container, then into the mixing use of insulation mortar.


5、送料上墙粉刷,每遍厚度在20㎜内,第二遍间隔在24小时以上。

5, feeding on the wall painting, each times thickness within 20 ㎜, second time interval within 24 hours.


6、保温层固化干燥后(一般的48小时)方可进行抹聚合物抗裂砂浆,首层应铺贴双层网格布。

6, insulation dry curing (general) 48 hours before being polymer anti-crack mortar, first floor should be double grid cloth.


7、钎网网格布按楼层间竖尺寸事先载好,网格布包边应剪掉。

7, brazing wire mesh grid cloth according to the size of floor between the vertical load well in advance, and the grid cloth edge should be cut off.


8、抹聚合物抗裂砂浆厚度约3~4㎜,抹完一定宽度立即用铁抹子压入另一侧,严禁干搭。

8, polymer anti-crack mortar with thickness of about 3 ~ 4 ㎜, finished with a certain width immediately with iron float into the other side, it is strictly prohibited to dry.


9、网格布之间搭接宽度不应小于50㎜,当压入一侧,再抹一些抗裂砂浆压入另一侧,严禁干搭。 

9, grid cloth lap width should be not less than 50 ㎜, when pressed into the side, add some anti-crack mortar pressure into the other side, it is strictly prohibited to dry.


10、网格布铺贴要平整,无褶皱,砂浆饱满度应达到100%。

10, grid cloth shop is stuck to level off, without fold, mortar plumpness should reach 100%.


11、窗口处均应翻包收口处理,应在窗口四角应力集中部位附加200㎜×400㎜的玻钎进行加强处理。

11, the window should be compacted in convergent processing, should be in the window corners of stress concentration place additional 200 ㎜ x 400 ㎜ intensive processing of bo qian.


12、外保温体系与门、窗框间作防水处理。

12, external thermal insulation system with door and window frames intercropping waterproof processing.


13、分隔缝按照设计要求及建筑物里面效果图,弹线后用壁纸刀及专用工具沿线开出设定的凹槽。

13, separating seam according to the design requirements and buildings in rendering, after the bomb line with wallpaper knife and special tool set out along the grooves.


14、凹槽使用聚苯乙烯或圆棒加防水胶嵌缝剂嵌成相应凹缝。

14, groove using polystyrene or round bar to add waterproof glue sealing agent is embedded into the corresponding groove joint.


15、要求阴阳角方正,凹槽平整,缝与平面抹灰同时进行,网格布搭接在缝中部。

15, requirements of Yin and Yang Angle founder, grooves flat, seam and surface rendering at the same time, the grid cloth lap seam in the middle.


16、瓷砖面作法:把网格布改成热镀锌丝网加锚固钉,其它一样。

16, ceramic tile surface approach: add anchor pin grid cloth into hot dipped galvanized wire mesh and other.


二、膨胀玻化微珠保温砂浆施工注意事项:

Second, expanding vitrified beads insulation mortar construction matters needing attention:


1、料浆必须即配即用,配制好的料浆应在2H内用完,严禁二次加水使用。

1, the slurry must match box, namely preparation good slurry should be finished within 2 h, the secondary water use is forbidden.


2、配制的抗裂砂浆须搅拌5分钟,必须搅拌均匀。

2, preparation of anti-crack mortar shall stir for 5 minutes, must mix.


3、配制的抗裂砂浆必须在1~2小时内使用完毕。

3, preparation of anti-crack mortar must be within 1 ~ 2 hours after use.

以下产品    详细咨询18832673888   进入网站查看详细情况

保温材料 www.maibw.net

保温砂浆 www.hdbwsj.com

硅酸盐板 www.huadong123.com

阿里巴巴华东官网 lfhuadong.1688.com

阿里巴巴华东分店 huadong.1688.com


最新评论
请先登录才能进行回复登录
  • 电话直呼

    • 18831662333
    • 销售经理 :
    • 售前咨询 :
    • 售前咨询 :
    • 售后服务 :
    • 售后服务 :
    • 合同签订/施工方案 :
    • 合同签订/施工方案 :
  • 扫一扫,关注旺铺